Country dossier / EU-27
Textile EPR in Slovenia
National implementation preparation
Broad research: 6 Oct 2026 · Selected verification: 2 Nov 2026. Source review coverage is stated below.
The general government waste/EPR page was reopened and does not identify a new textile-specific operating scheme. Limit: A general stream page cannot exclude unreviewed specific duties.
Organisations & financing route
No authorised operating textile PRO verified
Constitution & legal approval
Authorised operating textile scheme not verified in the reviewed source pack
Implementation timing
National date not verified; EU establishment deadline 17 April 2028
Next evidence trigger
Final national law, register, scheme authorisation and tariff
Competent authority
Ministry of the Environment, Climate and Energy (MOPE); Slovenian Environment Agency (ARSO) and competent inspectorates.
Legal basis
Environmental Protection Act (ZVO-2) and Waste Decree supply the general framework. A 2026 consultation/draft is not evidence of a final textile EPR tariff or PRO approval.
Product scope
Final national textile EPR scope not verified. Use the EU Annex IVc map in section 2 for readiness; apply the final national annex before calculating liability.
Fees & financial basis
No operative national textile tariff verified. Treat the value as unresolved; obtain a dated scheme tariff once the national route is established.
Eco-modulation
No operative national textile schedule verified. Future criteria depend on national implementation; a certificate alone does not establish a discount.
Targets & denominators
No country-specific numerical textile EPR quota verified in the source pack. Separate collection duties continue; the revised EU directive does not set one uniform numerical textile quota.
Registration & reporting
No operative textile-specific EPR return verified. Prepare national POM mass, product codes, producer-role and transaction evidence. Continue applicable waste and packaging reporting.
Organisations & approval status
No authorised operating textile PRO verified in the source pack. Collectors, charities and PROs for other streams are separate roles.
Next milestones
Monitor textile-specific implementing measures, collective-system recognition, register and tariff publication. Check domestic collection obligations and treatment documentation under existing waste rules.
Practical risks & controls
Risk: generic EPR guidance or an existing packaging registry being used as proof of textile compliance. Mitigation: require textile-specific legal scope and authorisation and maintain a separate waste/export audit trail.
Sources and verification dates
S085 · Odpadki | GOV.SI ↗ Reopened 2 Nov 2026S086 · Ravnanje z odpadki | GOV.SI ↗ Base record 6 Oct 2026S087 · Vrste odpadkov | GOV.SI ↗ Base record 6 Oct 2026Common EU framework
A constituted organisation, a pilot and an authorised compulsory system have different legal effects. Unresolved scope, approval, tariff and filing questions remain visible in this dossier. Source-page reopening is not a complete current licence audit.